Joined
·
14,626 Posts
It wants to pull up on the ends, maybe 1/2” or so. I’ll probably do it upside down and let gravity do the work. I’ll do some tests and see if that will hold in place.
I’ll do the rtv on the flats while upside down. Extra amounts around and through the location holes. Then, since I can access from back side easily, I’ll make my own “pegs” with additional rtv through those locator holes to the other parts to hopefully give a bit more help to hold in place.
All hinges on whether it will actually lay flat or not. Will move to basement with a nice controlled temp and humidity environment so no curing surprises.
I’ll do the rtv on the flats while upside down. Extra amounts around and through the location holes. Then, since I can access from back side easily, I’ll make my own “pegs” with additional rtv through those locator holes to the other parts to hopefully give a bit more help to hold in place.
All hinges on whether it will actually lay flat or not. Will move to basement with a nice controlled temp and humidity environment so no curing surprises.